A cleaned text extract from the T1985 archive, shown for source transparency. This is one of the documents T1985 Intelligence draws on. Restricted, financial, and personal material is excluded from public view.

Checklist C02: Master Plan Review Project Information Field Value Project Name [e.g., Keturah Creek] Review Date [DD/MM/YYYY] Reviewer [Name, Title] Review Stage [ ] Concept [ ] Schematic [ ] Design Development [ ] Final 1. Land Use Compliance Item Standard Compliant? Notes Open Space Allocation ≥ 20% of total area [ ] Yes [ ] No Residential Allocation 40-60% of total area [ ] Yes [ ] No Commercial Allocation 5-12% of total area [ ] Yes [ ] No Community Facilities ≥ 3% of total area [ ] Yes [ ] No 2. Density & Building Heights Item Standard Compliant? Notes Low Density Zones FAR ≤ 1.0, Height ≤ G+1 [ ] Yes [ ] No Medium Density Zones FAR ≤ 2.5, Height ≤ G+3 [ ] Yes [ ] No High Density Zones FAR ≤ 5.0, Height ≤ G+10 [ ] Yes [ ] No Height transitions are gradual Visual harmony maintained [ ] Yes [ ] No 3. Open Space Quality Item Standard Compliant? Notes Central Park / Signature Space ≥ 20,000 sq.m for Tier 1/2 [ ] Yes [ ] No [ ] N/A Pocket Parks Within 300m of all residences [ ] Yes [ ] No Green Corridors Connect all major open spaces [ ] Yes [ ] No Shade Coverage ≥ 40% of pedestrian areas [ ] Yes [ ] No 4. Mobility & Connectivity Item Standard Compliant? Notes Pedestrian Network Continuous, connects all destinations [ ] Yes [ ] No Cycling Network Separated from vehicles, continuous [ ] Yes [ ] No Traffic Calming Implemented in residential areas [ ] Yes [ ] No Public Transit Integration Planned or existing [ ] Yes [ ] No [ ] N/A 5. Biophilic Design Integration Item Standard Compliant? Notes Water Features Present in signature open spaces [ ] Yes [ ] No Native Planting ≥ 70% of plant species [ ] Yes [ ] No Views to Nature All residences have views to green [ ] Yes [ ] No Natural Materials Specified in public realm [ ] Yes [ ] No 6. Phasing Strategy Item Standard Compliant? Notes Phase 1 creates a complete neighborhood Includes amenities, open space, retail [ ] Yes [ ] No Infrastructure precedes residential Roads, utilities delivered first [ ] Yes [ ] No Each phase is financially viable Standalone pro forma [ ] Yes [ ] No 7. Overall Assessment Rating Description [ ] Approved Master plan meets all Keturah standards. Proceed to next stage. [ ] Approved with Conditions Minor revisions required. List conditions below. [ ] Revisions Required Significant revisions required. Resubmit for review. Conditions / Required Revisions: 1. 2. 3. 8. Sign-Off Role Name Signature Date Master Planning Lead Wellness Director Project Director
Continue in the guided assistant